solution construction and Engineering re-evaluated the design of the tower as desired by the client to enure that originally designed structure using traditional floor system verstality agaianst the change to post tension slab , the reason behind the change is to make sure faster compilation of the concrete structutre .
Arabnews says :
Hilton Worldwide has announced the signing of a management agreement with Obeikan Real Estate Development Company for the fourth Hilton Hotels & Resorts property in Riyadh, Saudi Arabia.