esolution construction and engineering compeleted the design and construction of the hotel in six months, the tower redesign awarded to esolution as sub consultant , where reduction of 16 million Saudi Riylas has been made during the value engineering process , proceeded to construction of the post tension slabs to compilation
Mezzanine floor view - photo taken from Ground floor level