Mall - Al khobar

  • City:Dammam
  • Country:Kingdom of Saudi Arabia
  • Scope: Geo-Technical

Esolution construction and Engineering Saudi Arabia in cooperation with ESPT Prestressed concrete contracting LLC, Dubai United Arab Emirates been awarded supply, supervision and testing of soil nailing work for Avenue Mall Project, in which the nail encompas around 65.00 Tonns of nails, the depth of cuts onsite ranges from 4.00 to 11.00 meters, ESPT completed the task in 4 months from contractual includes all necessary design and testing of the nails complying with Saudi Arabia local standard 

Project Strutcural design consultant : Ramboll

Soil Nail for temporary Application up to 2 years service life installed into drilled holes on site grouted before inserting the bars, where the bar position controlled by centeralizer at the middle of the bar to remain at the center of the hole, ESPT have written additional steps for installation purposes and being approved by the consultant.